- Well HH12P*** in Erodes, Northern China: it took 3 days to complete the 850m Horizontal Section, which needs 8+ days on average.
- Well Ha1*** in Tarim Basin, West China: 6960mTD; 167 °C BHT; completed 20 days ahead of planned time.
- Well*** in Tarim Basin, West China: 7511m TD, 156°C BHT and 16.3°/30m DLS; completed 12 days in advance.
- Well Xinken*** in Aksu, West China: 7019m TD.
- Well TP***CH in Xinjiang: 7179m TD, 26.5°/30m DLS and 148°BHT; completion is required by the client to be achieved 30% before schedule, while the actual day of completion was 2 more days in advance.
SAGD Magnetic Steering System
- Well FHW*** I/P in Xinjiang: the average drilling cycle is 10 days shorter than that of silimar wells nearby.


High-quality OBM Cuttings Recycling
With Cavaville's self - developed Thermal Desorption equipments, Cavaville has succesfully provide the service for CNOOC, Sinopec, CNPC and PetroChina in their oil based mud drilling cuttings disposal project.